Regen and the Electricity Storage Network have responded to the Department for Net Zero and Energy Security (DESNZ) Long Duration Energy Storage consultation on a new cap and floor scheme. This consultation was informed by the LDES scenario deployment analysis report we completed for government with LCP Delta alongside the consultation (see summary blog here).
See the response here and below.